Long Son Petrochemical Refinery Project - Vung Tau

The Southern Petrochemical Complex Project (Long Son Petrochemicals - LSP) with a total investment of 5.4 billion is being operated, with a scale of nearly 400 hectares of land, nearly 70 hectares of land with water surface and about 194 hectares of water surface for make a port. The construction items of this Southern Long Son Petrochemical Complex project have been implemented since November 2019 and were synchronized in early 2020.

 

Long Son petrochemical complex project is a key project that applies the most modern and advanced technologies and techniques so that the operation process meets safety conditions, protects the environment, and ensures production. High quality petrochemical products are PP, PE,... The project is large-scale with a large number of workers participating, the investor and contractors must strictly comply with labor safety regulations. Therefore, lifting equipment, cranes, trucks, metal materials, and labor protection used during the labor process are all quality tested and possess the ability to operate safely.

Phuong Nam with extensive experience in the field of providing lifting equipment and materials for large projects has been chosen as the supplier of lifting equipment and construction materials for the Long Son Petrochemical project. - Vung Tau. Phuong Nam provides a variety of products and equipment to serve customer needs and accelerate project progress.

Phuong Nam equipment provided for Long Son Petrochemical project - Vung Tau

Types of equipment Phuong Nam provides for the Long Son - Vung Tau Petrochemical project such as trucks, crane trucks, specialized cranes, forklifts and generator rental,...

Phuong Nam machines and equipment provide the project to perform tasks such as: Crane heavy goods, lift goods and people, transport materials in the project, etc. .

All of Phuong Nam's machinery and equipment as well as supplies can meet project needs from the smallest to the largest jobs. All equipment is inspected, maintained, and ensures safety and quality to serve all tasks in the project well.

Types of materials provided by Phuong Nam for Long Son Petrochemical project - Vung Tau

Materials Phuong Nam has provided for the Long Son project:

  • Metal supplies: Hand tools, bolts, screws, silicone glue, cutting, welding, grinding accessories,…
  • Labor protection: Safety shoes, boots, helmets, safety belts, atgt warning lights, gloves,…
  • Electrical supplies: Circuit breakers, sockets, light bulbs, electric cables,…
  • Water industry supplies: Water pipes, ball valves, flanges,...
20240225_QsEMW49g.jpg

All materials provided by Phuong Nam for the project are of guaranteed quality, tested and delivered on time as required to ensure progress and safety for workers.

Refer to some signed contracts using the link below:

HẠNG MỤC/ 

CATEGORIES

HỢP ĐỒNG/ 

CONTRACT LINK

DỰ ÁN/

PROJECT

Tổng thầu cung ứng vật tư/ 

General contractor for supply of materials

TPSK-PN. 01/09/2020Long Son Petrochemical

Tổng thầu cung ứng thiết bị thi công

General contractor for equipment supply

TPSK-PN. 10/02/2020Long Son Petrochemical